Showing posts with label Viabizzuno. Show all posts
Showing posts with label Viabizzuno. Show all posts

Sunday 11 March 2012

Final weeks of the build.....

 Bricks to the front of the house have been cleaned and repointed. Ciaran specified that tuck pointing should be used on the pointing - when you get up close to the pointing you can see an indented line all the way around the pointing - an element that might be missed but as Architect Mies Van Der Rohe said "God is in the details"


 The back wall has been cleaned down and repointed - Ciaran has made it a feature of the house with the back wall being made of glass and built right up to this natural stone wall. I think it is one of his favourite things in the house!


 We are nearing the end of the main building works - lists of what has to be done in each room have been put up on the plastered walls.

 Some of our new lights ready for fitting in the bathroom 




                              Current state of the bathroom