Sunday 27 May 2012

The hoarding is down!

Steel cladding is nearly finished!

The hoarding has been taken down at the front of the house and the   wrought iron railings are being put back up.  The railings will be fitted in to the original granite plinth.

Friday 25 May 2012

Subway tiles


The downstairs bathroom has been tiled.  Ciaran chose a white subway tile with no bevel.  These proved difficult to locate.  The bevelled subway tile is easy enough to procure in Ireland but the non-bevelled subway tile is not commonly found.  At one point we thought we may have to ship them in from the States but luckily an Irish supplier was found eventually.


              The grouting is a dark grey to make the tiles stand out.


                                   
                                                    Upstairs bathroom


                       
                                  Downstairs bathroom

Wednesday 23 May 2012

Paint!


Choosing colours with the assistance of the Dulux Paint Specialist.   The very dark sample above is the paint for the fireplace.



ODKM Facebook

Tuesday 22 May 2012

Cladding

                                    Corten steel cladding

The Corten Steel (Weathering Steel) will rust and turn a lovely colour that will blend in with the environment.

                      Lights have been fitted in the Studio


If you are on Facebook, please check out ODKM Facebook

Sunday 20 May 2012

Sunday visit.....

Visited the house today with my sister.  We were both pleasantly surprised by what stage it is at.  The steel cladding looks really well on the external walls of the new extension to the back of the house.

I also walked up the glass stairs to the studio!
Eeek!  Scary!!!!

                      Heated towel radiator in the bathroom

Saturday 19 May 2012

Second Fix electrics

The second fix electrics have begun.  
This is the light switch in the Studio, I think it looks great against the MDF wall covering.


 Ciaran explaining to me about the control panel for the lighting.

Friday 18 May 2012

Weathering corten Steel!

Ciaran was out on site twice today.  The corten steel (weathering steel) is going up on the building and the fixings needed to be detailed. Ciaran had hoped to do hidden fixings but due to the properties of the steel this could not be done at a reasonable cost so he had to come up with an alternative fixing detail.  All going well the steel cladding will take a couple of days to be fitted.

Door out from the kitchen to the teeny-weeny yard.

Studio with the doors open - Builder is preparing the external wall for the cor-ten steel fixings.


                         





Wednesday 16 May 2012

Oak Paneling

The services (electrical mains, alarm panels, sound system hub) will be positioned under the stairs. They will be covered by beautiful oak panelling which will then run in to the downstairs W.C. and kitchen.

        The picture shows the panelling being sized up and fitted.




Monday 14 May 2012

Moving along.....

A lot happened on site today!  The timber floor was laid in the hallway.  A hatch was then cut out to make storage under the floor.  I have been banned from referring to it as a trapdoor by Ciaran(!) but I like to think I have a trapdoor in my house!!!  It's sounds like the start of a story........... "Entry to the other realm is by the trapdoor in the hallway......."  Sorry I am digressing! Back on track now >>>  The floor is made of oak and will be stained a dark colour and then sealed.


Off-site the corten steel has finally been cut and will be delivered to the house tomorrow.  It will be hung on stainless steel brackets tomorrow to form a seal on the outside of the house.  Once we get the building water tight the finish line is only a couple of weeks away!!!


The shutter boxes for the downstairs windows were started and should be completed shortly.  The finishing touches to the concrete floor will be done next week - the brass expansion joints will be polished up and then the hardener will go on to the floor.  Three layers of hardener will be needed to give the polished look to the concrete floor.


We are hopeful that the painter/decorator will be in next week.  He is scheduled to come on Monday to do the white undercoat throughout the house.  Ciaran met with the colour specialist from Dulux paints today to discuss paint.  She took samples of the chosen wallpaper to make paint matches for the ceilings.


Things are certainly moving so fingers crossed it will all go smoothly!

Saturday 12 May 2012

About the kitchen.....

Kitchen designer Dean Cooper has informed us that the kitchen has arrived from Germany.  He sent us two photos for a look-see!

Apart from some teeny weeny samples of counter top and the oak panels this was the first time I have got to see the kitchen as the kitchen is all the work of Ciaran and Dean and I was not involved in the kitchen design process.

The pictures below are of one of the floor drawer units.  Note that the grain of the oak panels run through from drawer to drawer and that the whole carcass and insets have been powder coated black as per Ciaran & Dean's specifications.



The kitchen will be fitted in about 2 weeks time.

For more Dean Cooper Kitchens please go to the website


Friday 11 May 2012

Glass stairs!

The glass stairs are in!  


The glass stairs lead up to the third floor room.


Sunday 6 May 2012

Look what I just bought!

The bedrooms are going to be kept quite traditional and classic. Features like the window shutter boxes, coving and ceiling roses give the rooms this feel.  Ciaran also decided that we would wallpaper these rooms!


Wallpaper!  I know!  
I think it must be 20 years since I have lived somewhere that has wallpaper. 

Ciaran reckons he will bring it back in to vogue!




Here is the box of wallpaper from Laura Ashley in the back of my Smart Car!