Steel plate being welded to the structural steel. After the
under floor heating is laid concrete will then be poured on
to the steel to create the floor in the bathroom.
This blog was originally started to track our progress as we regenerated a derelict Victorian house in Dublin. We turned an old crumbling ruin in to our dream house! If you wish to read through the trials and tribulations of the house build it is best to start at the oldest blog post and read in date order. The blog then evolved in to being all about my life in Dublin, Ireland and then life in Malaga, Spain with artist "PIGSY" and now back in Dublin I hope you enjoy reading it!
Pizza!!! |