We have been making lots of decisions on certain finishing elements over the past few days and here is an update on what has been decided upon.
*Bench seats have been drawn up in detail after months of tweaking and sketching and drawings have been sent to the steel manufacturer.
*Samples of steel rod inserts for the polished concrete entrance way have been examined and a rod has been chosen for use. A drawing of a random layout for the rods has been sent on to the steel supplier so that an order can be placed for the quantities required
*Manufacturing drawings have been approved for the inverted bi-folding courtyard window and has gone in to production
*Lighting procurement is progressing - there will a 6 metre long recessed ceiling light in the kitchen, a 4 metre long recessed light for illuminating the back wall and trimless twin and single downlighters in various locations throughout the house.