The services (electrical mains, alarm panels, sound system hub) will be positioned under the stairs. They will be covered by beautiful oak panelling which will then run in to the downstairs W.C. and kitchen.
This blog was originally started to track our progress as we regenerated a derelict Victorian house in Dublin. We turned an old crumbling ruin in to our dream house! If you wish to read through the trials and tribulations of the house build it is best to start at the oldest blog post and read in date order. The blog then evolved in to being all about my life in Dublin, Ireland and then life in Malaga, Spain with artist "PIGSY" and now back in Dublin I hope you enjoy reading it!
Showing posts with label sound system hub. Show all posts
Showing posts with label sound system hub. Show all posts
Wednesday 16 May 2012
Subscribe to:
Posts (Atom)